endstream
endobj
startxref
A REVIEW OF THE USE OF RECLAIMED ASPHALT - Read online for free. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW), CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. VDOT Soils and Aggregate Compaction 2016v1.0 Chapter 1 | 1 Heavily compacted soils contain few large pores, less total pore volume and, consequently, a greater density. Please check your spelling or try another term. 2 0 obj
Milo Wade; 3 years ago ; Views: Transcription. Locate Utilities Prior to excavating the trench area, all utilities should be located by a qualified contractor. A copy of the Storm Sewer/Culvert Inspection Report (inspection report)including any video tape/digital Video Recording (DVD)/digital photographs shall be provided to the VDOT Inspector within two business days of the completion of the inspection and made part of the project records. All materials and workmanship, TABLE OF CONTENTS NO. These guidelines are applicable to the locating, marking, SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. (Make a Mark on Outside of Pipe) Moving pipe around after joining may cause pipe joint to work apart. The following is a list of SPECIFICATIONS, which may be related to this section: A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. Virginia Department of Transportation documents: Road and Bridge Specifications and appropriate supplemental specifications Virginia Test Methods Manual Road and Bridge Standards. Pipe Culverts 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes 600-5 2. 6) Where can the typical underdrain drawings be found? Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING.
`*r[anyv Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or, Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. Post installation inspections shall be conducted no sooner than 30 days after completion of installation and placement of final cover (except for pavement structure). 7) What is the maximum height of cover for a 48 inch pipe diameter Class IV concrete pipe culvert? ), Index. 7 0 obj 296 0 obj
<>
endobj
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. We encourage you to plan accordingly and register soon, to allow ample time for your staff to meet all the requirements needed for recertification. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials, To make this website work, we log user data and share it with processors. %PDF-1.5
%
Other sets by this creator. A compacted soil has a reduced rate of both water infiltration and drainage. The specific locations are shown on the plans. Leak Resistant: A joint which limits water leakage at a maximum rate of 200 gallons/inch diameter/mile/day for the pipeline system for the project specified head or pressure. 3 ft. A standard Video/ Digital Camera can be used. All rights reserved. The moisture content at which a soil can be compacted to its maximum dry density with the least amount of comparative effort is called the optimum moisture content. Public Involvement Manual. TThe Construction Materials Testing Soils exam is delivered on a computer at Pearson Vue Testing Centers. There are many types of compaction equipment available. . The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. All cracks shall be digitally scanned to allow for accurate measurement. If the soils is 100 percent saturated and the voids are full of water and has a high MC. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. Your one-stop source for VDOT maps, data and project info. Rock more than 2 inches in its greatest dimension shall not be placed within 12 inches of pipe. 10) Backfill the trench using clean #8 or #57 aggregate as soon as practical, but not later than the end of each working day. VDOT Materials Certification Schools. SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE, STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. True or false: Open graded aggregates are used in pavement to give the structure more strength. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes, Note: The text must be edited to suit specific project requirements. This course is based on ASTM D6938-17a1 Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth). CHAPTER 4 STUDY QUESTIONS 2) True or False. Materials Notebook Resource Document (pdf 2 MB) March 16, 2015. x 12 in./ft. VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Verifying that the correct pipe has been delivered for the applications on your project. Suggested participants would include contractor and supplier quality control personnel, consultants, testing firms and agency . All rights reserved. VDOT Soils and Aggregate Compaction: Chapter 2, VDOT Soils and Aggregate Compaction: Chapter 3, VDOT Soils and Aggregate Compaction: Chapter 4, VDOT Soils and Aggregate Compaction: Chapter 5, VDOT Soils and Aggregate Compaction: Chapter 8, VDOT Soils and Aggregate Compaction: Chapter 6.
2016v1.0 Chapter 4 2, 3 Structural System Structural System Figure 4.2a: Reinforced Concrete Figure 4.2b: Flexible Pipe Culverts are generally designed for the loads they must carry after construction is completed. lift) = 13 tests required (minimum) (Answer) Backfill around Manholes (minimum) One test every fourth compacted lift around the perimeter; beginning after the first 4 inch compacted lift above the bedding and continue to 5 feet below the top of the structure. SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE, Division 2 Section 32 14 13.19 Section 02795. 2016v1.0 Chapter 4 14, 15 POST INSTALLATION INSPECTION The following is an excerpt from Virginia Test Method 123 Post Installation Inspection of Buried Storm Drain Pipe and Pipe Culverts covering the scope of post installation pipe inspection. Compaction testing on No. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. The gradation is the distribution of various particle sizes within the material. SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. SECTION 33 41 00 REINFORCED CONCRETE PIPE. ]1YW'; q=A D0Yf BD0A8 Dh s @!2au28!w)#Nb=` L
*w @y7![RYT6 Ke`riO05 ~z
To use this website, you must agree to our, SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701), State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS, SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS, Wastewater Capital Projects Management Standard Construction Specification, Section 02702 SEWER PIPE INSTALLATION AND TESTING, SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to, DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant. This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. <>
Fine particles are more sensitive to the presence of water than coarse particles. Currently VDOT certified or Mid Atlantic Regional Technician Program (MARTCP) in the following disciplines: - Expected VDOT Certifications Soil and Aggregate Field Compaction Asphalt Field Hydraulic Cement Concrete Field Pavement Marking Flagger Certification Certification & Issuing Agency Soil and Aggregate Compaction - VDOT or NICET LEVEL II* = 12 lifts 3) 12 lifts 1 lift (skip first lift) = 11 lifts 4) 11lifts 4 (test every fourth compacted lift) = 2.75, round up to 3 tests in bottom 4 ft. of backfill Top 5 ft. of backfill x 3 lifts/ft. Additional temporary fill is needed to protect the pipe from construction loads. Importance to Maintenance & Water Quality. When performing a manual visual inspection: There must be adequate crawl/walking space and VDOT Safety Policy and Procedure #8 Confined Space Entry Policy and Procedure must be followed. Exams are offered at various locations in Virginia. Soils will not need to obtain a VDOT Soils and Aggregate Compaction Certification. STORM SEWERS. 7-1 7.2. The foundation is to be explored below the bottom of the excavation to determine the type and condition of the foundation. Students must bring valid ID & attend class in order to test. Computation of U.S. Haunching material may be Class 1 and must be placed and compacted in 6 inch loose/4 inch compacted maximum lifts, compacted to 95 percent standard proctor density. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix D | 1 This website includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia. The exploration should extend to a depth equal to per foot of fill height or 8, whichever is greater. Single Offset: This joint first appeared in the early 1990 s. This style of spigot is much easier to manufacture. This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. 2) Mechanical compacting ram: If a mechanical compacting ram is used, it must be calibrated to produce results Computer-based testing (CBT) allows NICET to extend several benefits to our customers: more flexible exam dates and appointment times; immediate scheduling and confirmation; and quicker exam scoring. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily, 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS, SECTION 9 SEWER/DRAINAGE LINES 9.1 GENERAL This section covers the requirements for piping materials and installation in the Cedar Hills City sewer and drainage collection system. Figure 4.1: Precast Concrete Pipe 2016v1.0 Chapter 4 1, 2 BASIC PIPE AND SOIL CONCEPTS The type of pipe selected for a particular application depends on many factors. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Pipe Materials B. 4 in.) Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works, SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. 500 grams is the minimum sample required for soils and for aggregate the sample size depends on the Nominal Maximum Size Aggregate. Conducts and/or observe and document test on soils, asphalt, concrete, aggregates, bituminous products, metal products and industrial coatings. When standing water is in pipe foundation area, No. This type joint gasket combination provides a leak resistant joint. For all roadway projects that are constructed by private contractors for VDOT and for all roadway projects constructed by others that are or will be proposed to be accepted into the VDOT highway system, a visual/video camera post installation inspection is required on all storm sewer pipes and for a selected number of pipe culverts in accordance with the instructions contained in this VTM and Section of the VDOT Road and Bridge Specifications. (Road and Bridge Spec. %PDF-1.4 It is generally easier to install due to less stringent lubrication requirements for the gasket. Block and gravel inlet Protection (Temporary) 6.52.1. large void spaces and is loosely compacted. stream
Personal Holding C, Civil Service Personal Background Evaluation, Revised 7/16. This happens because large pores more effectively move water downward through . Structural Fill See Section (A)(2)(g) of the Road and Bridge Specifications for complete requirements for backfill material. SECTION 9. The behavior of a material where the material deforms under load and does not go back to its original shape is called plasticity. materials (soils, aggregate and asphalt) in the field, the Geotechnical firm shall be responsible for the continuous monitoring of the placement and compaction of aggregate base materials, asphalt concrete pavement and the placement and compaction of earthwork and backfill of trenches and structures to ensure compliance with the Specifications. Download Free PDF. <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/Annots[ 11 0 R 12 0 R 21 0 R 25 0 R 31 0 R 32 0 R 33 0 R 34 0 R 47 0 R 48 0 R 49 0 R 50 0 R 51 0 R 52 0 R 53 0 R 54 0 R 55 0 R 56 0 R 57 0 R 60 0 R 61 0 R 62 0 R 63 0 R 64 0 R 65 0 R 66 0 R 67 0 R] /MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
402.02. Prepared by Risi Stone Systems Used by permission. Concrete Field - Current ACI must be submitted to MaterialsCertification@vdot.virginia.gov ; Soils and Aggregate Compaction - Physical demonstration of proficiency - scheduled by CCWA **New **Central Mix Aggregate Plant - Physical demonstration of proficiency - scheduled by CCWA **New** To learn about CHANGES up to 2018, please review the . VECAT,through Germanna Community College (GCC), is hosting the following courses, which are now available either online or in a face to face format: For more information on courses and registration click here or contact Judith Calvert, 540-937-6757. (Provide three) a) b) c) 2) Explain when a rock correction is utilized and what happens to the laboratory maximum dry density and optimum moisture values after a rock . A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. Weigh clean dry container and record weight. STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. AASHTO M 145 The Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes. Table of Contents I. Iowa DOT Information a. To prevent sloping soils from becoming. 2016v1.0 Chapter 4 11, 12 Types of Joints for Concrete Pipe Tongue & Groove: A bell & spigot type joint with straight walls (flush bell). M`RyK?77&kr7#q*Xg`QU0iFfu{8nWW0-dNGC2lC8IA]uuLq\_gyxlP%n%[et:eR%iXebrq-b#[3'mAgh*ofmYe`4"7ex2j-RUi*LBI+KIyU9/S(zh2=m6|Em0.oaIvJI>a$ACDMSDq;~7Qj=i~=+eV39CB9vq,v=WTusaO.TVDP)v`y':PsASO&QePN27=RffF)fM{IUY_82 9Z0:}t8hc>C[U\sDK lUh"(o)
0N*5"ziE^ Yr*bgubM@/6Elg[r9o0p ;I(|)sX\(v2r. Fine particles are more sensitive to the presence of water than coarse particles. 5) Install pipe to grade 6) Compact structural bedding outside the middle third of the pipe 7) Place structural bedding in lifts 8) Complete structural backfill operation by working from side to side of the pipe, differential not to exceed 24 or 1/3 size of pipe. SUMP DRAINS 7-3 7.3. Bell and Spigot: A pipe with a flared bell has the outside diameter of the bell larger than the outside diameter of the pipe.